Progress Made Since the Last Update

Plans are being made for new signage that will delight those who use the Quince Orchard Library once we reopen.

As indicated in the last post, much work has been done to refurbish the exterior building, parking lot and grounds.  Cracked concrete has been replaced, new parking space lines have been painted, and repairs have been made to the outside of the building and to the stonework in the entrance columns.

Work being done on the exterior of the Quince Orchard Library
Work being done on the exterior of the Quince Orchard Library

The new book drop for the branch has arrived and is awaiting installation by the construction contractor.

Boxed Kingsley book drop ready to be installed
Boxed Kingsley book drop has arrived

The new height adjustable circulation and information desks have arrived and have been installed.  There are stations for three staff members to serve the public at the circulation desk and two stations at the information desk.  The new service desks are next to each other and are welcoming and bright.


New Circulation Desk has been installed
New Circulation Desk has been installed


New Information Desk has been installed
New Information Desk has been installed

Height-adjustable furniture to support the branch's two self-charge machines arrived and has been installed.  This should allow for much more flexible use of the self-charge machines, no matter the height of the individual.

Height-adjustable Self-Charge Machine tables
Height-adjustable Self-Charge Machine tables

The new door for the Discovery Room (the doorway was relocated to create a branch storage space area) arrived without glazing and will be replaced with one that has a glass window.


Discovery Room door to be replaced
Discovery Room door to be replaced

The branch large meeting room has been enhanced with a motorized room divider.  The room divider has been installed and will enable staff to subdivide the large meeting room so that two smaller groups can use the space.  One of its safety features is that it will require two people, one on either side of it, to operate the switches, providing visibility on both sides..


Meeting Room Divider in its housing
Meeting Room Divider in its housing



Meeting Room Divider partially opened
Meeting Room Divider partially opened

The motorized shades arrived and have been installed in the large meeting room and in the lounge area at the front of the building.  The electronic feature will permit staff to raise and lower the shades depending on lighting conditions.


New motorized shades in the lounge area
New Motorized Shades in the lounge area

All of the fluorescent light in the building will be replaced by LED lighting.  This will produce more cost efficient light that will be brighter and more effective in the reading, book stack and work areas.

Old fluorescent lighting on the left, new LED lighting on the right
Old fluorescent lighting on the left, new LED lighting on the right

Another great addition, near the front entrance, is the colorful and cheerful "BOOKS" bike rack, which replaces our previous "wave"  bike rack.

New bike rack for customers
New bike rack for customers

As you can see, there is much to be excited about as we approach the reopening of the Quince Orchard Library, refreshed and raring to go!








Labels: ,